Hello,
All updates going forward will be made on the main website, tech support forum, and Facebook. The last update was made on Facebook and showed some images of equipment that has been purchased. The process of starting a new cnc shop to support Synergy RC is not going to happen over night. The current situation with Covid-19 has made progress even slower than one would expect.
Currently, we are finally getting settled in Ohio but it hasn’t been without challenge. The shop we are working out of needed major structural repairs. Along with these structural repairs, the shop needed insulation and a furnace installed so the cnc equipment operates at the proper temperature. The structural repairs have been completed as of October 28th. The furnace install is 90% complete. The insulation will be installed in two weeks. After that, we will be finishing the internal walls.
On a different note, we have been informed through a very reliable source that Yintech plans to dump their Synergy inventory on the market at under factory cost as soon as my production of parts begins. As you could imagine, this poses a very big risk for me as running large quantities of parts and not being able to sell them would be catastrophic. I have not yet decided what to do but as you could understand I need to proceed very carefully in the beginning of production.
Thank you for your loyalty and patience.
Matt Botos