Hi Guys,
I have a question regarding the build of the clutch stack on the N7. The manual states that the helical pinion is "factory installed"
At the time, I took this to mean that it has been pre-threadlocked etc at the factory. When I build the clutch stack, I simply pulled the top cap off with the 2x M2.5x6 socket head screws, saw the top nut was in place, checked the tightness and then re-installed the top cap with threadlock.
Do I need to strip it all down again to put red threadlock on the helical pinion? This build thread doesn't appear to show any kind of factory installed thread lock on the pinion, but I don't know if the kits have changed over time
http://www.rcheliaddict.co.uk/synergy/106130-synergy-n7-big-build-thread.htmlMy second question is, are there any parts available to space the engine from the mounts, should I need it? I have been unable to find any N9 engine spacers. Some people have reported needing to space the engine from the mounts 0.5 - 1.0mm to get the gear mesh correct and the clutch stack properly aligned with the engine itself.
My engine is an OS105HZ-R.
Thanks!