May 21, 2024, 02:49:10 PM

Author Topic: Charge Station  (Read 15630 times)

flyalan

  • Guest
Charge Station
« Reply #30 on: March 27, 2013, 10:04:46 PM »
It looks great Rich!  I know how much of an engineering job it was to get the duo mounted and ventilated properly.  Thanks a billion.
Alan
« Last Edit: March 31, 2013, 06:14:11 PM by flyalan »

Offline RichL

  • Synergy Veteran
  • *
  • Posts: 802
Re: Charge Station
« Reply #31 on: March 31, 2013, 09:17:46 PM »
Alan, thanks it was a bit of a challenge but, the finished product turned out great.  Just tracked your package looks like you will receive it tomorrow.  Alright Kevin its your turn!   :)

Rich
Synergy E5: Scorpion HKIII 4025-1100, CC ICE2 120HV, Rail 556/96, V-Bar Silverline

Synergy E7: Quantum 4530-500, CC ICE2 160HV, Rail 716/116, V-Bar Silverline

Offline RichL

  • Synergy Veteran
  • *
  • Posts: 802
Re: Charge Station
« Reply #32 on: March 31, 2013, 10:02:15 PM »
I Charger 410 Duo charge station.
« Last Edit: March 31, 2013, 10:05:42 PM by RichL »
Synergy E5: Scorpion HKIII 4025-1100, CC ICE2 120HV, Rail 556/96, V-Bar Silverline

Synergy E7: Quantum 4530-500, CC ICE2 160HV, Rail 716/116, V-Bar Silverline

Offline Barry Tilson

  • Field Representative
  • Synergy Veteran
  • ****
  • Posts: 617
  • Perspective Visuals
Charge Station
« Reply #33 on: April 01, 2013, 04:42:49 AM »
Looks awesome!
Perspective Visuals

flyalan

  • Guest
Re: Charge Station
« Reply #34 on: April 01, 2013, 06:36:11 PM »
Well UPS arrived just a bit ago!  This thing looks even better than the photos.  I will have to get it out in the sunlight and take a few more pics.  The duct work inside is very well done.  The power supply and fans are also very quiet.


Thanks Rich for your efforts!


Cheers
Alan

Offline RichL

  • Synergy Veteran
  • *
  • Posts: 802
Re: Charge Station
« Reply #35 on: April 01, 2013, 09:18:33 PM »
Alan, you are welcome brother.  Thank you for the business.  I hope you enjoy your new charging station!

Rich
Synergy E5: Scorpion HKIII 4025-1100, CC ICE2 120HV, Rail 556/96, V-Bar Silverline

Synergy E7: Quantum 4530-500, CC ICE2 160HV, Rail 716/116, V-Bar Silverline

Offline Greg Jackson

  • Field Representative
  • Synergy Hero
  • ****
  • Posts: 1493
    • inner3.com
Re: Charge Station
« Reply #36 on: April 06, 2013, 08:03:22 PM »
Rich is just an incredible guy with impeccable character.  I will probably order one just because of that.  But will it work with the X4 or must it be the icharger?  Also, is there some sort of power supply inside, how does the charge station work?
Synergy & Rail Field Representative
Team Scorpion||Team BK Servos||Team Pulse|

www.inner3.com

flyalan

  • Guest
Charge Station
« Reply #37 on: April 06, 2013, 08:26:00 PM »
Rich will mount just about anything I believe. The Duo was a bit of a challenge! If he does not have a template of your specific charger you may need to send it to him for a proper fitting. That is what I did.
Rich likes to use Meanwells due to their relatively small footprint and reliability. I had him get me a Meanwell 1000w. He got it at a better price than I could have.  He does a great job ducting and venting the power supply and in case the actual charger.
Got lots of oohs and aahs at the field today:-)

Alan


Alan Butler
Team Synergy

Offline RichL

  • Synergy Veteran
  • *
  • Posts: 802
Re: Charge Station
« Reply #38 on: April 12, 2013, 09:01:02 PM »
Greg, sorry for the delay in responding.  All of the charge stations I build are custom so I make make just about anything work.  As Alan said, you will just need to send me your charger.  I can change the design or customize a charge station to suit your particular needs.  Give me a call or send me a message if you have other questions.

Rich
Synergy E5: Scorpion HKIII 4025-1100, CC ICE2 120HV, Rail 556/96, V-Bar Silverline

Synergy E7: Quantum 4530-500, CC ICE2 160HV, Rail 716/116, V-Bar Silverline

Offline Greg Jackson

  • Field Representative
  • Synergy Hero
  • ****
  • Posts: 1493
    • inner3.com
Re: Charge Station
« Reply #39 on: April 29, 2013, 11:36:02 PM »
I'll give you  a call soon Rich.  Finals week is approaching. Plus I was pretty sick for a couple of weeks due to pollen.  Talk to you soon buddy!
Synergy & Rail Field Representative
Team Scorpion||Team BK Servos||Team Pulse|

www.inner3.com

Offline Barry Tilson

  • Field Representative
  • Synergy Veteran
  • ****
  • Posts: 617
  • Perspective Visuals
Charge Station
« Reply #40 on: September 12, 2013, 04:16:15 PM »
Putting together a charging station. Should I build my own or buy a caged threat? I have a unused pelican however its a bit large. Could put radios batteries and charger in one box? I like Riches designs. Have you tried putting a 4010 on the lid like the dual chargers?
Perspective Visuals

flyalan

  • Guest
Charge Station
« Reply #41 on: September 12, 2013, 04:30:08 PM »
Rich built mine. Will post a pic:-)
It has a Duo but he was unable to mount it in the lid due to the depth of the charger.  What he did was very nice though. I have storage space in front of the charger.
I will post a pic when I get home.

Cheers
Alan

flyalan

  • Guest
Re: Charge Station
« Reply #42 on: September 12, 2013, 05:23:27 PM »
Well i forgot to look further up the thread.  Rich had posted pics of the process building mine.


Here is the finished product...


Alan

Offline Barry Tilson

  • Field Representative
  • Synergy Veteran
  • ****
  • Posts: 617
  • Perspective Visuals
Charge Station
« Reply #43 on: September 12, 2013, 05:26:00 PM »
Looks like yours is up in the beginning of thread? 
Perspective Visuals

Offline Barry Tilson

  • Field Representative
  • Synergy Veteran
  • ****
  • Posts: 617
  • Perspective Visuals
Charge Station
« Reply #44 on: September 12, 2013, 05:56:18 PM »
This is a 1610 pelican. Looks like its a smidg bigger? Still like he extra room. Could even mount skid clamps to hold the helis? The HItec X4 is about the same size as the 4010.
Not a big fan of the cover that comes with the caged threat.