Synergy Nitro Helicopters > Synergy N5 / N5c
cyclic bell crank installation N5c
Nikzaff:
Maybe the bearing flages I recieved in the N5c kit were for the N5 kit. Are the frames on the N5 kit thicker??? I am not sure.. Just guessing at the moment.
Tommy Wagner:
Sorry the two sandwich the bearing there is a spacer that goes on the single bell crank side make sure to do the two ends first then the elevator crank then the arm
Tommy
Sent from my iPhone using Tapatalk
Nikzaff:
Spacer also installed. I have taken a few pics to show you.
[attachment deleted by admin]
Tommy Wagner:
Looks good the only thing I can think of now would be the washers that go on the bolt you can try a different one I think there is extra in the extra parts bag in the kit
It goes over the shaft and takes up the space
Tommy
Sent from my iPhone using Tapatalk
Nikzaff:
There is the answer. I have not put any washes in between the bolt and the shaft. There were no washes in the bag but i will try some in thespare parts bag. Will give it a go and let you know. Thanks.
Navigation
[0] Message Index
[#] Next page
[*] Previous page
Go to full version