I posted these pictures on other forums, I thought I should share it with guys as well:
The Box:
![](http://i1115.photobucket.com/albums/k551/p-to/Synergy%20build%201/1-box.jpg)
Some carbon parts:
![](http://i1115.photobucket.com/albums/k551/p-to/Synergy%20build%201/2-frame.jpg)
Belt idler assembly:
![](http://i1115.photobucket.com/albums/k551/p-to/Synergy%20build%201/2-roller.jpg)
Helical gear:
![](http://i1115.photobucket.com/albums/k551/p-to/Synergy%20build%201/2-main-gear.jpg)
I oiled the one way bearing so it would rotate freely:
![](http://i1115.photobucket.com/albums/k551/p-to/Synergy%20build%201/2-main-gear-one-way-bearing.jpg)
Main Transmission Assembly – 10mm Main shaft and hollow:
![](http://i1115.photobucket.com/albums/k551/p-to/Synergy%20build%201/2-main-transmission-assembly.jpg)
Silicone spray the belt:
![](http://i1115.photobucket.com/albums/k551/p-to/Synergy%20build%201/3--lube-the-belt.jpg)
![](http://i1115.photobucket.com/albums/k551/p-to/Synergy%20build%201/3-belt.jpg)
Half frame done!
![](http://i1115.photobucket.com/albums/k551/p-to/Synergy%20build%201/3-half-frame.jpg)
Not a fan of button head bolts, so I replaced some of them with socket head bolts:
![](http://i1115.photobucket.com/albums/k551/p-to/Synergy%20build%202/4-m3x6.jpg)
Rudder servo:
![](http://i1115.photobucket.com/albums/k551/p-to/Synergy%20build%202/4--rudder-servo.jpg)
![](http://i1115.photobucket.com/albums/k551/p-to/Synergy%20build%202/4--rudder-servo-cut.jpg)
Full Frame:
![](http://i1115.photobucket.com/albums/k551/p-to/Synergy%20build%202/4-full-frame.jpg)
RC Booya:
![](http://i1115.photobucket.com/albums/k551/p-to/Synergy%20build%202/4--rc-booya-install.jpg)
Carbon fibre servo horns:
![](http://i1115.photobucket.com/albums/k551/p-to/Synergy%20build%202/5--cyclic-servo-horn-install-cut.jpg)
![](http://i1115.photobucket.com/albums/k551/p-to/Synergy%20build%202/5-cylic-servo-horn.jpg)
Cyclic servos:
![](http://i1115.photobucket.com/albums/k551/p-to/Synergy%20build%202/5--servo-placement.jpg)
![](http://i1115.photobucket.com/albums/k551/p-to/Synergy%20build%202/5--servo-installed.jpg)
Main boom clamp installed:
![](http://i1115.photobucket.com/albums/k551/p-to/Synergy%20Build%203/5-main-boom-clamp-installed.jpg)
I didn't have the motor yet so skipped that part and went straight to tail box:
![](http://i1115.photobucket.com/albums/k551/p-to/Synergy%20Build%203/5-belt-drive-tail-box.jpg)
CA'd the flange bearing to the carbon plate:
![](http://i1115.photobucket.com/albums/k551/p-to/Synergy%20Build%203/5-flange-bearing.jpg)