November 25, 2024, 12:09:59 AM

Author Topic: Synergy E5/E6 Build Video Series  (Read 12672 times)

Offline Greg Jackson

  • Field Representative
  • Synergy Hero
  • ****
  • Posts: 1493
    • inner3.com
Re: Synergy E5/E6 Build Video Series
« Reply #15 on: December 16, 2012, 02:30:40 PM »
I hate to admit it but I have 3 people that are great at soldering so for major projects I let them do it because they have decades of experience. I can solder minor things but I'm turning to them for my connections on this helicopter.
Synergy & Rail Field Representative
Team Scorpion||Team BK Servos||Team Pulse|

www.inner3.com

Offline RichL

  • Synergy Veteran
  • *
  • Posts: 802
Re: Synergy E5/E6 Build Video Series
« Reply #16 on: December 16, 2012, 05:00:29 PM »


 Don't try to do it with a $20 radio shack pencil. Soldering big connectors correctly and safely requires a tool capable of maintaining consistent heat. Most pencils heat too slow. Not to say you can't get a pencil that will work, but normally the best thing to do, in my opinion of course, is get a good 100-200watt soldering station.


Sent from my iPhone using Tapatalk

I agree with Chris completely.  When soldering larger connectors and heavy gauge wire a soldering station is practically a must.  I use silver bead soldier which requires a temp of around 600 degrees to flow properly, a soldering pencil just won't get the job done. Having the right tools greatly reduces frustration and the likelihood of a cold soldier joint.

Rich

   
Synergy E5: Scorpion HKIII 4025-1100, CC ICE2 120HV, Rail 556/96, V-Bar Silverline

Synergy E7: Quantum 4530-500, CC ICE2 160HV, Rail 716/116, V-Bar Silverline

Offline Greg Jackson

  • Field Representative
  • Synergy Hero
  • ****
  • Posts: 1493
    • inner3.com
Re: Synergy E5/E6 Build Video Series
« Reply #17 on: December 16, 2012, 05:26:07 PM »
Still can't find a towel. Where can you get one?
Synergy & Rail Field Representative
Team Scorpion||Team BK Servos||Team Pulse|

www.inner3.com

Offline Chris Sexton

  • Factory Specialist
  • Synergy Hero
  • *****
  • Posts: 2729
  • Admiral, There be whales here!
Synergy E5/E6 Build Video Series
« Reply #18 on: December 16, 2012, 06:33:24 PM »
Go to mattbotos.com and click on the link on the right for the official synergy gear. This will take you to Nigel's store he had the towels there.


Sent from my iPhone using Tapatalk
Chris Sexton
Synergy Factory Specialist / Rail Blades / Team Scorpion

Offline Chris Sexton

  • Factory Specialist
  • Synergy Hero
  • *****
  • Posts: 2729
  • Admiral, There be whales here!
Synergy E5/E6 Build Video Series
« Reply #19 on: December 16, 2012, 06:34:56 PM »
Chris Sexton
Synergy Factory Specialist / Rail Blades / Team Scorpion

Offline Greg Jackson

  • Field Representative
  • Synergy Hero
  • ****
  • Posts: 1493
    • inner3.com
Re: Synergy E5/E6 Build Video Series
« Reply #20 on: December 16, 2012, 07:29:57 PM »
Great thanks!
Synergy & Rail Field Representative
Team Scorpion||Team BK Servos||Team Pulse|

www.inner3.com

Offline Chris Sexton

  • Factory Specialist
  • Synergy Hero
  • *****
  • Posts: 2729
  • Admiral, There be whales here!
Re: Synergy E5/E6 Build Video Series
« Reply #21 on: December 16, 2012, 11:15:28 PM »
Another tip came up on the HF forums.

I didn't film it, but when I pulled the bolts from the various frame stand offs and bearing blocks, I put all of them into a small servo case with rubbing alcohol.  The purpose of cleaning the bolts prior to assembling is to remove any lingering machine oil and debris that can hinder the loctite's ability to hold the bolt in place. 

As I said on the HF forum, when I set out to build this kit on camera, I wasn't thinking about the newer builder looking for tips to apply to any build, so I didn't think about covering some of the basics of prep.  I can see this kit is attracting ALOT of attention of newer flyers and I want to make sure this collection of videos is as in-depth and accurate as possible. I might even film a "prequel" video of sorts talking about the importance of prep, cleaning the bolts, which types of loctite to have on hand and such.

If you watch one fo the videos and think of something that I either neglected to touch on or didn't explain clearly, please let me know! i will do my best to touch on these topics when I go to put the boom and canopy on the frame for the final time.
Chris Sexton
Synergy Factory Specialist / Rail Blades / Team Scorpion

Offline Greg Jackson

  • Field Representative
  • Synergy Hero
  • ****
  • Posts: 1493
    • inner3.com
Re: Synergy E5/E6 Build Video Series
« Reply #22 on: December 16, 2012, 11:35:44 PM »
How long do you keep them in alcohol? Ways wondered about that.
Synergy & Rail Field Representative
Team Scorpion||Team BK Servos||Team Pulse|

www.inner3.com

Offline Chris Sexton

  • Factory Specialist
  • Synergy Hero
  • *****
  • Posts: 2729
  • Admiral, There be whales here!
Re: Synergy E5/E6 Build Video Series
« Reply #23 on: December 16, 2012, 11:37:34 PM »
I pulled all the bolts out of the metal and put in the alcohol.  How long it was there, can't say. By the time I had them all in the alcohol, I was starting to pull them out and dry them off.  I wipe them down and then let them air dry. Nice thing about alcohol, it evaporates fast.


Cyclic servos and FBL controller aren't in yet. Hopefully tomorrow, but might be tuesday before I get to mount electronics, might be wednesday before we see the next video.

Good news is we are almost done! Mount the servos, talk about setup, and button it up. Looking forward to it!

Thanks for following along.
Chris Sexton
Synergy Factory Specialist / Rail Blades / Team Scorpion

Offline NKY Heli Guy

  • Full Member
  • ***
  • Posts: 164
Synergy E5/E6 Build Video Series
« Reply #24 on: December 17, 2012, 01:44:08 PM »
Looking forward to it! Thanks for your efforts and hard work.


Sent from my iPhone using Tapatalk

Offline Chris Sexton

  • Factory Specialist
  • Synergy Hero
  • *****
  • Posts: 2729
  • Admiral, There be whales here!
Re: Synergy E5/E6 Build Video Series
« Reply #25 on: December 17, 2012, 02:01:29 PM »
Had to make an unexpected change in Cyclic servos, the RJX were delayed, so going back to plan A and running the Savox Sc-1267SG HV Cyclics like the set in my E5.

Brain came in today, so tonight we will talk about Electronics :)
Chris Sexton
Synergy Factory Specialist / Rail Blades / Team Scorpion

Offline Chris Sexton

  • Factory Specialist
  • Synergy Hero
  • *****
  • Posts: 2729
  • Admiral, There be whales here!
Re: Synergy E5/E6 Build Video Series
« Reply #26 on: December 17, 2012, 11:24:21 PM »
Another video filmed this evening, but due to a battery failure (rather the camera guy didn't charge it  >:( ) I lost alot of time and even some film. Won't have time to edit and publish tonight.

Tonights video got through servo and motor install as well as basic FBL setup.  Should be live by noon tomorrow.

Thanks!
« Last Edit: December 18, 2012, 07:24:15 AM by Chris Sexton »
Chris Sexton
Synergy Factory Specialist / Rail Blades / Team Scorpion

Offline Ross Lawton

  • Factory Specialist
  • Synergy Veteran
  • *****
  • Posts: 793
Re: Synergy E5/E6 Build Video Series
« Reply #27 on: December 18, 2012, 06:01:13 AM »
Nice job on the video's Chris, keep'em coming!  8)

Cheers,
Ross
Team Synergy - UK

Offline Chris Sexton

  • Factory Specialist
  • Synergy Hero
  • *****
  • Posts: 2729
  • Admiral, There be whales here!
Re: Synergy E5/E6 Build Video Series
« Reply #28 on: December 18, 2012, 08:16:42 AM »
Nice job on the video's Chris, keep'em coming!  8)

Cheers,
Ross


Thanks!

Part 5 - Electronics and Motor Install video is UP!
Chris Sexton
Synergy Factory Specialist / Rail Blades / Team Scorpion

Offline NKY Heli Guy

  • Full Member
  • ***
  • Posts: 164
Synergy E5/E6 Build Video Series
« Reply #29 on: December 18, 2012, 04:18:14 PM »
Sweet!


Sent from my iPhone using Tapatalk